Saturday, May 17, 2008

Another Chilly Spring Day in Naknek

From the looks of the dashboard it's going to be two cup of coffee pick. as Luke stands by in the heated cab of his crane.

Danny is doing the riggin' for the pick. Looks like the power pack for the trans-vac system on pump barge #2 is about ready to go.

David steadies the load with a tag line as it's weaved between obstacles on its way over the bull-rail.


The Sealion arrives as scheduled to move the barge into place as Danny guides the power-pak into its resting place for the 2008 season.

Job well done guys, now we're that much closer to being ready to start pumping salmon into the tanks!

No comments:

Post a Comment